Since starting work on the US 550 Rockfall Mitigation and Wall replacement project in May, crews have conducted slope excavation, and rock removal work at the Deer Creek location (Mile Point 59.3). Crews are currently working on a rockfall catchment wall at the Deer Creek location to provide a permanent barrier for other rocks and material that could fall from the slope. Excavated material has bee…